LGM. 07944 332211
Staff and subcontractor training · Module 1

The LGM EICR Standard

From the job landing on your phone to the landlord holding the report. Watch once, then keep the checklists and messages below open on every job.

16 minutes6 chaptersCaptions on screenBS 7671:2018+A4:2026Field handbook (PDF)

The job, step by step

Same order on every job. Chapter 2 of the video covers each step.

  1. Booked. Office captures address, beds, consumer units, tenant name and mobile, access and parking, pets, vulnerable occupants and medical equipment, last report, pre-approved fix-on-the-day limit, who to invoice. Missing details are chased by the office.
  2. Offered. WhatsApp offer plus the same by email. Area only until accepted. Reply YES or NO within 30 minutes. On YES: full address, tenant contact, job pack. Reply GOT IT.
  3. Prepare. Night before: read the job pack (last report, board photo, pre-approved list, care notes). Daily kit check.
  4. Tenant. Office sends booking confirmation, reminder the day before (reply C), and on-the-way message. You send “on my way, ETA” in the job chat when you set off. Unconfirmed by the afternoon before: office calls.
  5. Arrive. Check-in photo of the door. Name, LGM ID, who sent you. Shoe covers. The five questions. Find every board. Sheets down. Agree the power-off plan out loud. Offer the power station. No answer: call twice, message office, wait 15 minutes, photo, card.
  6. Isolate. Identify, isolate, lock off with your own lock and label, prove the indicator, test dead L–N, L–E, N–E, prove again. Can’t isolate safely: stop and call.
  7. Inspect. Thermal image of the board under load first. Then the inspection order. Every accessory looked at, at least 1 in 4 opened plus any hot, damaged, scorched or DIY. Limitations recorded with reasons and reported the same day. Test smoke and CO alarm buttons and note results.
  8. Test. Every circuit, no sampling. Dead: protective conductor continuity, ring continuity, insulation resistance (500 V, min 1 MΩ, sensitive equipment disconnected), polarity. Live: Ze, Zs, PFC, every RCD at IΔn (AC test), test buttons on RCDs and AFDDs, functional checks. Enter readings as you go. Sense-check.
  9. Code. Best Practice Guide 4. C1 danger present; C2 potentially dangerous; C3 improvement recommended; FI further investigation advised, only when you can’t see enough. C1: make safe, tell tenant, photos, call office now.
  10. Fix. Only landlord pre-approved fixed-list items. Message office with item and photo, wait for OK. Never quote or negotiate. Code as found, minor works certificate for the fix, note it on the report.
  11. Leave. Everything back on (boiler, fridge, router, alarms, clocks). Labels: periodic inspection with next date, RCD test notice, typed circuit chart. Passport tag fitted and scanned. Cover on, every screw. Tidy. Two minutes with the tenant. Check-out photos.
  12. Report. Within 24 hours. No blanks; extent and limitations with reasons; each observation with location, code, photo, plain sentence; next inspection (5 years max for rented). QS reviews and signs. Office sends landlord report, summary and quote; tenant copy with permission and proof kept.
  13. After. Office books remedials, then sends the landlord a written completion confirmation for tenant and council. Next due date to the compliance diary and the monthly six-month expiry list. Feedback request to landlord and tenant.

The job in pictures

Every conversation and every step, as in the video.

Mr PatelLandlordPriyaLGM officePhone callMR PATELI need an EICR for my flat in Leyton. Thetenant’s in.PRIYAOf course. Who’s the tenant, and the bestnumber? Any pets, night work or medicalequipment we should know about?PRIYACan I pre-approve small fixes up to £150, sowe can finish in one visit?MR PATELYes, up to £150 is fine.
Step 1 · The landlord calls the office: tenant, access, care notes and a pre-approved fix limit.
PriyaLGM officeAmiraTenantPhone callPRIYAHi Amira, it’s Priya from LGM, your landlord’selectrical contractor. Is tomorrow morningstill OK for the safety check?AMIRAI finish a night shift at 9:30. Could he comea bit later?PRIYAOf course. I’ll move it to 10:30 to 11:00 andtext you now. Daniel will show his LGM ID.AMIRAPerfect, thanks.
Step 4 · Not confirmed by the afternoon before: the office calls the tenant.
3DanielLGM electricianAmiraTenantDANIELHi, I’m Daniel from LGM. Your landlord askedus to do the electrical safety check. Here’smy ID.AMIRACome in.DANIELBefore I start: is anything tripping orflickering? Anyone on medical equipment orworking from home?
Step 5 · At the door: name, LGM ID, who sent you, then the questions.
1CallingAmira× 2Call the tenant twice2NO ACCESSLGM-2611-014called ×2 · waitingMessage the office315 minWait 15 minutes4Sorry we missed youLGM called at 9:20to rebook:07944 332211Photo of the door, leave a card
Step 5 · No answer at the door.
Cut-outnetwork operatorFUSEMetersupplier01234Isolatorswitch it off hereOFFNew boardour work starts hereSEALNever break the sealor pull the cut-out fuseIsolate here, lock offno isolator? the office books one
Step 6 · Isolate at the isolator, never the cut-out.
1Proveon the proving unit2Test deadL–N, L–E, N–E3Lock offyour lock, your key4Prove againtester still works
Step 6 · Prove, test, lock, prove.
HallKitchenBathroomBedroom 1Bedroom 2HallwayLiving roomCupboard123456789
Step 7 · The route: board, intake, bonding, room by room, outside last.
68.4°CBefore anythingis switched offHot spot: photograph itwith the temperature shownIt disappears oncethe power is off
Step 7 · Thermal image first, under load.
Looked atOpened upLooked atLooked atScorched: always openedEvery accessory looked at · at least 1 in 4 opened up+ every hot, scorched or DIY one
Step 7 · Every accessory looked at, at least 1 in 4 opened, every hot or scorched one opened.
Zs0.42Ωevery circuit · compare with Ze + (R1+R2)Recorded liveon your phoneRCD at IΔn23msAC test · 300 ms max (general type)Recorded liveon your phone
Step 8 · Readings recorded live.
C1Danger presentCracked socket,live parts exposedC2Potentially dangerous?No main bondingto the gas pipeC3Improvementplastic enclosurePlastic consumerunit in a homeFIFurther investigation?Can’t see enoughto decide (not for low IR)
Step 9 · What each code looks like.
DanielLGM electricianPriyaLGM officePhone call: straight awayDANIELC1 at Flat 3: the back bedroom socket iscracked, live parts exposed. I’ve isolatedthat circuit at 10:20, with Amira’s OK. Photosare in the chat.PRIYAThanks Daniel. I’ll call Mr Patel now and comeback to you within the hour.
Step 9 · A C1: make it safe, then call the office straight away.
PriyaLGM officeMr PatelLandlordPhone callPRIYAMr Patel, it’s Priya from LGM. Daniel found adangerous socket in the back bedroom. It’smade safe, and Amira knows that circuit isoff.MR PATELCan you fix it today?PRIYAYes. A new socket is £45, inside the £150 youpre-approved. Daniel will do it now and sendphotos.MR PATELGreat, go ahead.
Step 9 · The office tells the landlord within the hour.
DanielLGM electricianAmiraTenantIn the flatDANIELAll done, Amira. Everything’s back on: theboiler, the fridge and the router.DANIELYour landlord gets the report within 24 hours.This tag on the board opens its history onyour phone.AMIRAIs everything OK, then?DANIELNothing is dangerous now. The details are inyour landlord’s report, and you’ll get a copy.
Step 11 · Two minutes with the tenant: no verdict on the landlord.
VisitDanielReportwithin 24 hoursCheckedQualified SupervisorSentlandlord + summary + quoteTenant copywith permission, proof kept28daysRemedialswithin 28 days, then a letter
Step 12 · From the visit to everyone who needs it.
PriyaLGM officeMr PatelLandlordPhone callPRIYAHi Mr Patel, your report for Flat 3 is in. Thetwo problems Daniel found were fixed on theday, with photos. Amira has her copy.MR PATELGreat. When’s the next one due?PRIYANovember 2031. It’s in your diary, and we’llremind you six months before.PRIYAOne quick question: how did we do, from 1 to5?MR PATEL5. No chasing at all.
Step 13 · Closing the loop with the landlord.

The eight checklists

Tick as you go. Ticks are not saved: they clear when you close or reload the page.

1 · Daily kit

2 · Before you set off

3 · First ten minutes

4 · Safe isolation

5 · Inspection

6 · Testing

7 · Before you leave

8 · Report and submit

Messages, word for word

Replace anything in {curly brackets}. Never promise how long the check takes, never say "pay when it's done" or "no deposit", and call it a power station with 240V sockets.

Between the office and you

Job offer

Office · WhatsApp
LGM JOB OFFER · EICR
Ref {ref}

Where: {area, e.g. Leyton E10} (full address once accepted)
What: {beds}-bed {flat/house}, {n} consumer unit(s), tenant {in/out}
When: {day date}, arrive {window}
Pay: £{pay} · report due by {time, next day}
Notes: {care notes: nights, pets, vulnerable, parking}

Reply YES to take it or NO to pass. Open for 30 minutes.

Job offer

Office · Email
Subject: LGM job offer · EICR · {area} · {day date}

Hi {first name},

We have an EICR for you. The same details are on WhatsApp; please reply there with YES or NO within 30 minutes.

Ref: {ref}
Where: {area} (full address once accepted)
What: {beds}-bed {type}, {n} consumer unit(s)
When: {day date}, arrive {window}
Pay: £{pay}, paid weekly once the report is approved
Report due: {deadline}

Every LGM EICR includes: the 12-photo set, codes to Best Practice Guide 4, the arrival routine and the report within 24 hours.

Thanks,
LGM Office · 07944 332211

Confirmation after YES

Office · WhatsApp
Confirmed: {ref} is yours.
{full address}
Tenant: {first name}, {mobile}
Access: {buzzer, keys, parking code}
Job pack: {link} (last report, board photo, pre-approved list, care notes)

Reply GOT IT once you've read the notes.

No access

You · WhatsApp
NO ACCESS {ref}: arrived {time}. Called tenant {time} and {time}, no answer. Waited 15 min. Photo of door attached. Card left {time}.

Calling card wording

You · Card
Sorry we missed you. {Name} from LGM called at {time} on {date} for the electrical safety check booked by your landlord. Please call or WhatsApp 07944 332211 to rebook.

C1 found (call first, then send)

You · WhatsApp
C1 {ref}: {what and where, e.g. kitchen socket, cracked faceplate, live parts exposed}.
Made safe {time} by {isolating kitchen sockets circuit}. Tenant told; agreed. Photos before/after attached.
Now off: {what the tenant has lost}.

Fix on the day request

You · WhatsApp
Fix on the day? {ref}: {location}, {defect} ({code}). Pre-approved list item: {item}. Photo attached.

Office reply

Office · WhatsApp
Approved: fixed-list price applies, within the landlord's limit. Go ahead. / Not approved: record it and leave it; we'll quote the landlord.

Report submitted

You · WhatsApp
REPORT IN {ref} {time}. {n} observations: {C1/C2/C3/FI}. Minor works cert: {yes/no}. Anything the QS should know: {note}.

On my way

You · WhatsApp
On my way to {ref}, ETA {time}.

Check-in / check-out

You · WhatsApp
IN {ref} {time} [photo of front door]
OUT {ref} {time} [board as left + labels]. Outcome as found: {C1/C2/C3/FI count}. Limitations: {none / list}.

What the office sends tenants and landlords

Booking confirmation

Office · WhatsApp / SMS
Hi {first name}, this is LGM, your landlord's electrical contractor. Your electrical safety check (EICR) is booked for {day date}, arriving {window}. Your electrician is {name} and he'll show his LGM ID.

What to expect: the power goes off in short spells and we'll always warn you first. We need to reach every room and the fuse board.

Please tell us about any medical equipment, home working, alarms or pets. Need a different time? Just reply here.

Reminder, day before

Office · WhatsApp / SMS
Reminder: {name} from LGM arrives tomorrow, {window}, for your electrical safety check. Please make sure he can reach the fuse board. Reply C to confirm.

On the way

Office · WhatsApp / SMS
{Name} is on his way and should be with you at about {time}. He'll show his LGM ID at the door.

Tenant copy of the report (with landlord permission)

Office · Email / WhatsApp
Hi {first name}, here is your copy of the electrical safety report for {address}, completed on {date} on behalf of your landlord: {link}.
If anything electrical stops working or trips, please contact {your landlord / LGM on 07944 332211}. Thank you for letting us in.

Report to the landlord

Office · Email
Subject: Electrical safety report (EICR) · {address} · {Satisfactory / Unsatisfactory}

Hi {name},

The EICR for {address} was completed on {date}. The full report and a one-page summary are attached.

What we found: {n} C1 · {n} C2 · {n} C3 · {n} FI. {One plain sentence on what matters most.}
What happens next: {remedials needed within 28 days / none}. Our fixed price: £{x}, fixed unless we find a hidden fault, which we agree with you before we start. Reply YES and we'll book it.
Done for you: with your permission we sent your tenant their copy on {date} and kept proof of delivery.
Next inspection due: {date}. It's in your compliance diary.

Shan Kurrim · LGM · 07944 332211

Urgent: C1 found

Office · Phone, then email
Urgent safety issue at {address}. During today's electrical safety check our electrician found {plain description}, which was dangerous. He made it safe at {time} by {action}; {impact on the tenant}. To restore it safely we need {work}, fixed price £{x}. Can we book this for {date}?

Completion confirmation (for the landlord to send)

Office · Letter / email
To: {tenant(s)} and {council} · Property: {address}
Electrical Safety Standards in the Private Rented Sector (England) Regulations 2020: confirmation of remedial work.
The remedial work identified in the electrical installation condition report dated {date} was completed on {date} by London General Maintenance Ltd. Certificate(s): {ref}. Signed: {landlord or agent}, {date}.

Feedback

Office · WhatsApp
How did we do at {address} on {date}? Reply 1 (poor) to 5 (excellent), and one line on what we could do better. Thank you.

Coding and photos

Code every observation to Electrical Safety First Best Practice Guide 4. Under Amendment 4, any C1 or C2 makes the report unsatisfactory; a C3 or FI on its own does not.

C1
Danger present. Risk of injury now. Make safe, tell the tenant, photograph, call the office straight away.
C2
Potentially dangerous. Would become dangerous under a fault. Urgent remedial action.
C3
Improvement recommended. Not dangerous. On its own it does not make the report unsatisfactory.
FI
Further investigation advised. Only when you genuinely cannot see enough. Never for unidentified circuits or insulation below 1 MΩ: code those.

Not sure? Message the Qualified Supervisor before you submit, not after.

The 12-photo standard

  1. 1Front door at check-in
  2. 2Thermal image of the board under load
  3. 3Board as found, cover on
  4. 4Board open, wide
  5. 5Main earthing terminal and conductor
  6. 6Main bonding at gas
  7. 7Main bonding at water
  8. 8Meter tails and cut-out, seals untouched
  9. 9Tester screen: Ze
  10. 10Each limitation and why
  11. 11Labels, circuit chart and Passport tag
  12. 12Board as left, at check-out

Plus a close-up and a wide shot for every C1, C2 and FI.

Writing an observation

Where, plus what you saw, plus why it matters.

Weak: Damaged accessory. LGM standard: Back bedroom: double socket faceplate cracked, live parts accessible to touch.

Same quality, every job

Every report is reviewed and signed before it's issued, and our Qualified Supervisor checks every job.

How every job is checked

  • Every report reviewed and signed by the Qualified Supervisor before it's issued
  • Every job checked by the Qualified Supervisor: a video walk-round with the tenant's permission, or a revisit
  • Paid weekly, once the report is approved
  • The best scorecards get first offer of the next jobs

Your monthly scorecard

MeasureTarget
Reports in within 24 hours100%
Passed review first time90%+
Photo set complete100%
First-time access95%+
Callbacks and complaints0
Customer rating (1 to 5)4.8+

Three rules

Rule 1

Prove, test, prove.

Rule 2

If it isn't photographed, it didn't happen.

Rule 3

Honest codes, report in 24 hours.