LGM.07944 332211
Staff and subcontractor training · Module 2

The LGM Board Change

From the job landing on your phone to a board you would sign your name to. Watch once, then keep the drawings, checklists and messages below open on every job.

About 16 minutes6 chaptersCaptions on screenBS 7671:2018+A4:2026Field handbook (PDF)

The LGM board, cover off

Every board we fit looks like this. At least 2 spare ways, blanked and marked, on every board.

ONMAIN100A DPSPDType 2green = OKTB4030mA1ShowerTB3230mA2CookerTB3230mA3KitchenTB3230mA4SocketsdownTB3230mA5SocketsupTB1630mA6WaterheaterTB630mA7LightsdownTB630mA8LightsupTB630mA9AlarmsBLANKSPAREBLANKSPAREMetal enclosure · example 2-bed flat · Essential1Main switch2Surgeprotection3RCBO onevery circuit4At least 2spare ways5Earths incircuit order6Main earth16mm²7Bonding 10mm²to gas and water8Torqued andmarked9Cables inthrough glands
1 main switch · 2 surge protection · 3 RCBO on every circuit · 4 at least 2 spare ways · 5 earths in circuit order · 6 main earth 16mm² · 7 bonding 10mm² · 8 torqued and marked · 9 cables in through glands

Essential

Metal board, an RCBO on every circuit, surge protection.

Premium

Essential plus arc-fault protection (AFDDs) on sockets and bedrooms, and an energy monitor.

Future-Ready

Premium plus a larger board with room for an EV charger, solar or a battery.

Every tier: At least 2 spare ways · certificate · power station loan · Property Passport tag · 6-year guarantee · fixed price, unless we find a hidden fault, which we agree with the customer before we start.

The job, step by step

Same order on every board. Chapter 2 of the video covers each step.

  1. Booked. Every job starts with a video survey or a Basic Board Safety Check. The office records the board tier, the board plan, survey photos, isolator, earthing type, any solar, battery or EV, care notes, the fixed price and the deposit. No isolator: the office books one before the job is offered.
  2. Offered. WhatsApp and email: area, tier, circuits and spare ways, arrival time, the agreed power-off window, your pay and the certificate deadline. Reply YES or NO within 30 minutes. On YES: full address, customer details, job pack. Reply GOT IT once you have checked the plan against the photos.
  3. Prepare. Night before: read the board plan way by way. Every device in the pack matches the plan and is the same make as the board. Count the ways: circuits + at least 2 spare. Download the maker’s instructions (torque values, SPD wiring). Charge the power station. Print the chart, notices and Passport tag.
  4. Customer. The office confirms the date, your name, arrival window and power-off window, explains the power station and asks for a metre clear around the board and meters. Reminder the day before (reply C). You send “on my way” with an arrival time in the job chat.
  5. Arrive. Check-in photo, name, LGM ID, shoe covers. Six questions, including solar, battery or EV. As-found photos: old board closed and open, thermal image under load, cut-out with seals, earthing and bonding. Agree the power-off window out loud again.
  6. Protect. Dust sheets from the door to the board, corner and floor protection, vacuum ready from the start. Power station set up before anything goes off: router, laptop, phones. Fridge and freezer stay shut.
  7. Pre-test. Ze and prospective fault current at the origin. Earthing and bonding present and sized. Identify every circuit. Isolated: insulation resistance on every circuit, check for borrowed neutrals. Record as found. Hidden fault: stop, make safe, photo, message the office, wait for the customer’s written agreement.
  8. Isolate. Never break a seal or pull the cut-out fuse. Switch off at the isolator and lock it off. Prove the tester, test dead L–N, L–E, N–E, lock off with your own lock, prove again. Solar or battery: isolate those too, as their labels say.
  9. Strip out. Tag every conductor (3L, 3N, 3E) before you disconnect it. Photo of the tagged board. Cut back damaged ends to fresh copper. Too short: hidden fault process. Suspect asbestos: stop, don’t break it, call. The old board leaves with you for recycling.
  10. Fit. Level, square, every fixing used. Cables in through the maker’s glands, no open holes. Devices in plan order. SPD as the instructions show. Every terminal torqued to the maker’s value and marked. Earths and neutrals in circuit order. Correct strip lengths. Every spare way blanked.
  11. Test. Dead tests first: continuity (R1+R2, rings), insulation resistance, polarity. Main switch on with every RCBO off, then one circuit at a time. A trip: stop and find out why. Live: Ze, PFC, Zs every circuit, every RCBO at IΔn with trip time, test buttons, SPD indicator, AFDD test.
  12. Restore. Every circuit works: lights in every room, sockets with a plug-in tester, cooker, shower, water heater, boiler and heating controls, alarms tested, fridge, freezer and router on, clocks reset. Send POWER ON with the time in the job chat.
  13. Hand over. Typed circuit chart (spares marked), RCD test notice, next inspection label, mixed colours notice if needed. Passport tag fitted and scanned. Show the customer a trip, the reset, the test button and the 2 spare ways. Power station back, sheets up, vacuum, after photos.
  14. Certify. EIC on the Amendment 4 forms, every schedule complete, trip times recorded, 15-photo set, by 9am the next day. The Qualified Supervisor checks every job. The office sends the certificate, makes the Building Regulations notification, issues the guarantee and the balance invoice.
  15. After. One message to the landlord or homeowner with everything in it. One week on: is everything working? Review request. Next inspection date into the compliance diary.

Doing it right, in pictures

The drawings from the video and the handbook.

Cut-outnetwork operatorFUSEMetersupplier01234Isolatorswitch it off hereOFFNew boardour work starts hereSEALNever break the sealor pull the cut-out fuseIsolate here, lock offno isolator? the office books one
Isolate at the isolator. Never break a seal or pull the cut-out fuse.
1Proveon the proving unit2Test deadL–N, L–E, N–E3Lock offyour lock, your key4Prove againtester still works
Prove, test dead, lock off, prove again.
Board plan · LGM-2611-021 · EssentialMSMain switch 100A DPSPDSurge protection Type 2per instructions1ShowerB40 RCBO 30mA10mm²2CookerB32 RCBO 30mA6mm²3KitchenB32 RCBO 30mA2.5mm² ring4Sockets downB32 RCBO 30mA2.5mm² ring5Sockets upB32 RCBO 30mA2.5mm² ring6Water heaterB16 RCBO 30mA2.5mm²7Lights downB6 RCBO 30mA1.5mm²8Lights upB6 RCBO 30mA1.5mm²9AlarmsB6 RCBO 30mA1.5mm²S1SPAREblank fittedS2SPAREblank fitted
The board plan in every job pack, with spare ways S1 and S2.
Kitchen3L · 3N · 3ELights down7L · 7N · 7EAlarms9L · 9N · 9E
Tag every conductor before it is disconnected.
✗Open knockouts, bare holes✓Manufacturer’s glands, no gaps
Cables in through the maker’s glands; no open knockouts.
set NmSet to the value in themanufacturer’s instructionsTorque, then marka moved line shows a loose screw
Torque to the maker’s value, then mark.
✗Crossed, tangled, hard to trace✓Dressed: straight, in order, easy to trace
Dressed, not tangled: the photo test.
1 · DeadR1+R2 andringcontinuity2 · DeadInsulationresistance3 · DeadPolarity4 · LiveZe and PFC5 · LiveZs everycircuit6 · LiveEvery RCBOat IΔn7 · LiveTestbuttons,SPD, AFDD8 · LiveEverycircuitworkingNothing is switched on until the dead tests pass
Dead tests first, then live.
GASmeterwithin 600 mm, before any branchSAFETY ELECTRICAL CONNECTIONDO NOT REMOVE10mm² to the board
Main bonding at the gas meter.
Property Passporttap or scanTyped circuit chartevery way, spares markedRCD test noticepress T every 6 monthsNext inspection labeldate of the next checkMixed wiring coloursonly when old colours remainPlus the EIC and Building Regulations notification, sent by the office
What goes on every board.
87%Power station, 240V socketsWi-Fi routerLaptop and phonesTVFridge and freezer: keep shutHeating, oven, shower: off
The power station: what stays on.

The ten checklists

Tick as you go. Ticks are not saved: they clear when you close or reload the page.

1 · Van and kit

2 · Night before

3 · First fifteen minutes

4 · Protect

5 · Pre-test

6 · Safe isolation

7 · Strip and fit

8 · Test and switch on

9 · Restore and hand over

10 · Certificate and submit

Messages, word for word

Replace anything in {curly brackets}.

Between the office and you

Job offer

Office · WhatsApp
LGM JOB OFFER · BOARD CHANGE
Ref {ref}

Where: {area} (full address once accepted)
What: {beds}-bed {flat/house} · {tier} · {n} circuits + {spares} spare
When: {day date}, arrive {window}
Power off: about {from} to {to} (agreed with the customer)
Pay: your agreed rate · certificate due {deadline}
Attached: board plan, survey photos

Reply YES to take it or NO to pass. Open for 30 minutes.

Confirmation after YES

Office · WhatsApp
Confirmed: {ref} is yours.
{full address}
Customer: {name}, {mobile} · Tenant: {name}, {mobile}
Access: {buzzer, keys, parking}
Job pack: {link} (board plan, survey photos, care notes)

Reply GOT IT once you’ve checked the plan against the photos.

On my way

You · WhatsApp
On my way to {ref}, ETA {time}.

Check-in

You · WhatsApp
IN {ref} {time} [photo of front door]

Hidden fault found

You · WhatsApp
HIDDEN FAULT {ref}: {what}, {where}.
Found by: {test and reading, e.g. insulation resistance 0.2 MΩ L–E on circuit 4}.
Made safe: {how}. Photos attached.
Fix needed: {fix}. Fixed-list item: {item / none}.
Waiting for the OK before any extra work.

Office reply

Office · WhatsApp
Approved in writing by {customer} at {time}: go ahead with {fix}.
/ Not approved: leave circuit {n} disconnected, safe and labelled, and record it on the certificate.

Power on

You · WhatsApp
POWER ON {ref} {time}. All {n} circuits tested and working. {spares} spare ways. Customer shown the board.
Circuits left off: {none / circuit and reason}.

Check-out

You · WhatsApp
OUT {ref} {time} [board as left, cover on, labels and tag] [work area]

Certificate submitted

You · WhatsApp
CERT IN {ref} {time}. EIC complete, 15 photos uploaded. Anything the QS should know: {note}.

What the office sends customers

Booking confirmation: homeowner

Office · WhatsApp / email
Hi {first name}, this is LGM. Your new fuse board is booked for {day date}. {Electrician} arrives {window} and will show his LGM ID.

The power is off for about {from} to {to}. We bring a power station with 240V sockets for your Wi-Fi, laptop and phones. Heating, hot water, the oven and an electric shower are off for those hours; keep the fridge and freezer shut and they stay cold.

Please clear a metre around the fuse board and the gas and water meters. Tell us about any medical equipment, alarms or freezers. Your price is fixed, unless we find a hidden fault, which we agree with you before we start.

Booking confirmation: tenant

Office · WhatsApp / SMS
Hi {first name}, this is LGM, your landlord’s electrical contractor. Your new fuse board is being fitted on {day date}. {Electrician} arrives {window} and will show his LGM ID.

The power is off for about {from} to {to}. We bring a power station with 240V sockets for your Wi-Fi, laptop and phones. Keep the fridge and freezer shut.

Please clear a metre around the fuse board and the meters, and tell us about any medical equipment, alarms or freezers. Need a different day? Just reply.

Reminder, day before

Office · WhatsApp / SMS
{Electrician} arrives tomorrow, {window}. Power off about {from} to {to}. Please make sure he can reach the fuse board and the meters. Reply C to confirm.

On the way

Office · WhatsApp / SMS
{Electrician} is on his way and should be with you at about {time}. He’ll show his LGM ID at the door.

Hidden fault: agreement request

Office · WhatsApp / email
Hi {name}, while testing before the old board came off, {electrician} found {plain description} on {circuit}. Photos attached.

To connect it safely to the new board it needs {fix}, fixed price £{x}. Reply YES to go ahead today. If you’d rather not, we’ll leave that circuit safely disconnected and labelled, finish the board, and you can decide later.

Power back on

Office · WhatsApp
Power is back on at {address} ({time}). Every circuit has been tested. {Electrician} will show you the new board before he leaves.

Completion: landlord or homeowner

Office · Email
Subject: New fuse board fitted · {address}

Hi {name},

Your new {tier} board was fitted on {date}. Power was back on at {time}.
Attached: the Electrical Installation Certificate, before and after photos, and the Property Passport link: {link}.
{Tenant} has been shown the board, how to reset it and the test button.
Your board has {spares} spare ways, ready for an EV charger, solar or an extension.
To follow: the Building Regulations certificate and your 6-year guarantee in writing.
Balance due: £{x} (50% deposit on booking, 50% on completion). {payment details}

Shan Kurrim · LGM · 07944 332211

One week on

Office · WhatsApp
Hi {first name}, one week on from your new fuse board: is everything working as it should? Reply 1 (poor) to 5 (excellent), and one line on what we could do better. Thank you for having us.

Same quality, every job

Our Qualified Supervisor checks every job.

The 15-photo set

  1. 1Front door at check-in
  2. 2Old board, closed
  3. 3Old board, open
  4. 4Thermal image under load
  5. 5Cut-out, seals intact
  6. 6Earthing as found
  7. 7Bonding: gas
  8. 8Bonding: water
  9. 9Tagged, before strip-out
  10. 10New board dressed, cover off
  11. 11Torque marks, close-up
  12. 12Spare ways, blanks fitted
  13. 13Tester: Ze and an RCBO trip time
  14. 14Cover on, labels and tag
  15. 15Work area, at check-out

Twelve things customers value

1Fixed price, in writing
Hidden faults agreed before any extra work
Office
2Tested before we promise
Faults found at 9am, not 3pm
You
3Power back when we said
The window agreed and kept
You
4Power station on loan
Wi-Fi, laptop and phones stay on
You
5A clean, protected home
Sheets, corners, vacuum, shoe covers
You
6An RCBO on every circuit
One fault, one circuit off
Board
7At least 2 spare ways
Ready for an EV, solar or extension
You
8A board worth photographing
Dressed, torqued, marked, typed chart
You
9Shown, not just told
Trip, reset, test button, spares
You
10Every document, no chasing
Certificate, photos, Building Regs
Office + QS
11Property Passport tag
History on any phone
You
126-year guarantee
In writing, on the board and the work
Office

Three rules

Rule 1

Prove, test, prove.

Rule 2

Test before you promise.

Rule 3

Leave a board you’d sign your name to: dressed, torqued, labelled, and 2 spare ways.